Karaj Metro Line 2 EPC project includes design, engineering, procurement of equipment and machinery, installation and test and commissioning of electromechanical equipment and supply of one motorized metro car. The length of this line is 23.65 km, with 22 underground stations. Also, this project contains Kamalshahr depot equipment, Malard parking and the control center.

ELECTROMECHANICAL EQUIPMENT OF THE CONTRACT ARE AS FOLLOWS:
  • Power Supply
  • Signaling and OCC
  • Telecommunication
  • Control {PCC/SCADA)
  • Air Ventilation
  • BAS for Station
  • AFC
  • FAS
  • HVAC
  • Workshop Equipment & Auxiliary Vehicle