Project Specifications

The Isfahan Metro Line 1 project involves design, engineering, procurement, transportation, installation, commissioning, preparation of engineering documents, personnel training, procurement of spare parts and guarantee for power supply, SCADA, signaling and telecommunication systems. The Isfahan Metro Line 1 runs over 21 kilometers. The main part of the route is underground and inside a double track tunnel; the other part is in two single line tunnels and about 600 meters is also in open track, U-wall form. The employer of this project is Isfahan Urban Railway Organization.


Project Image