MAPNA Delivers First Batch of MAP24 Locomotives to MSC

MAPNA Delivers First Batch of MAP24 Locomotives to MSC

MAPNA Group has delivered its first batch of MAP24 locomotives to Mobarakeh Steel Company (MSC).MAPNA delivered its homegrown locomotives to MSC on Sunday March 13, 2022, as part of a contract to supply 50 MAP24 freight locomotives to the giant steelmaker.MAPNA Group President Abbas Aliabadi noted MAPNA Group is obliged to deliver the locomotives to Mobarakeh Steel Company within two years.Aliabadi added that over 90% of the 3,300hp MAP24 locomotives have been designed and produced by the domestic experts.MAP24-1 locomotive, designed and manufactured by MAPNA Locomotive Engineering and Manufacturing Company (MLC), is equipped with a turbocharged 16-cylinders diesel engine, 3300 HP nominal...

Read More

MAPNA Group to Supply MSC with 50 Advanced Locomotives

MAPNA Group has signed a contract to provide 50 advanced MAP24-1 locomotives to Mobarakeh Steel Company (MSC).The agreement was inked on Sunday February 7, 2022, by MAPNA President Abbas Aliabadi and MSC Head Mohammad-Yaser Tayyebnia, in a ceremony attended by President Ebrahim Raeisi and Industry, Mining, and Trade Minister Reza Fatemi Amin.As per the deal, MAPNA Group is obliged to deliver the locomotives to Mobarakeh Steel Company within two years.MAP24-1 locomotive, designed and manufactured by MAPNA Locomotive Engineering and Manufacturing Company (MLC), is equipped with a turbocharged 16-cylinders diesel engine, 3300 HP nominal power, therefore it is considered a diesel-electric...

Read More
MAPNA Group to Supply MSC with 50 Advanced Locomotives

MAPNA Group Participates in Iran Trans Expo 2021

MAPNA Group and its subsidiaries, including MAPNA Multimodal Transportation Company (MMT), MAPNA Locomotive Engineering & Manufacturing Company (MLC), and MAPNA Wagon Pars Company, took part in the event, showcasing their latest products and services.Coincided with the National Transport Day in Iran on December 17, the theme of this year’s exhibition was “development of infrastructure, renovation of fleet, and efficient transport.”Each day of the exhibition from December 17 to 22 was dedicated to a specific mode of transport, respectively to the road, rail, air, maritime, transport infrastructures, and support and quality control of projects.Affiliated companies and...

Read More

Tehran Metro Line 6 Electrical, Mechanical Maintenance Assigned to MAPNA Group

MAPNA Group is set to play larger role in the development of Tehran Metro Line 6 megaproject by conducting routine repair maintenance of the electrical and mechanical equipment of the subway line.According to an agreement between the Tehran Urban & Suburban Railway Operation Company and MAPNA Rail Construction & Development Company (MRC), the MRC has been tasked with performing periodic and emergency maintenance, equipment procurement, and engineering on Line 6.The agreement, which took effect on October 23, 2021, will last for one year.Electrical equipment, controls systems and signals, facilities, telecommunications infrastructure, railways, escalators, elevators, air...

Read More