۱ |
South Pars Gas Field Development – Phase 13 |
Pars Oil and Gas Co. (POGC) |
EPC |
In Progress |
Construction of Utility and Process Units |
۲ |
South Pars Gas Field Development – Phase 14 |
Pars Oil and Gas Co. (POGC) |
EPC |
In Progress |
Construction of Utility and Process Units |
۳ |
Isfahan Refinery Expansion, package C |
National Iranian Oil Engineering & Construction (NIOEC) |
EPC |
In Progress |
Construction of Utility and Off-Site Units |
۴ |
South Pars Gas Field Development – Phases 15&16 |
Sepanir Co. |
EPC |
In Progress |
Construction of Utility Units |
۵ |
South Pars Gas Field Development – Phase 19 |
Petropars Co. (PPL) |
EPC |
In Progress |
Construction of Export Gas Compressor Unit (Unit 106) Including Fiscal Metering Skid |
۶ |
South Pars Gas Field Development – Phases 13 and 22-24 |
Petro Karan Shafagh Kish Co. |
EP |
In Progress |
Designing And Supplying 16 Sets of Turbo-Compressor For Gas Compressor Stations (Unit 106) |
۷ |
Supply of 100 Turbo-Compressor Units |
Iranian Gas Engineering and Development Co. (IGED) |
EP |
In Progress |
Manufacturing, Supply, Installation and Supervision |
۸ |
Custody Metering &
Monitoring Project |
Petroleum Engineering & Development Company |
EPC |
In Progress |
Manufacturing of 70 Units of Metering Skids for Oil Flow Measurement and Monitoring the Data Transfer |
۹ |
Iran L.N.G. – Water Supply and Processing |
Iran LNG |
EPC |
In Progress |
Construction of Water/Steam Supply and Distribution as well as Fire Fighting Units |
۱۰ |
Iran L.N.G. (E-LNG Package) – Power & Steam Generation |
Iran LNG |
EPC |
In Progress |
Construction of 5 Gas Power Plants, 2 Cycle Power Plants and 5 Boiler Units |
۱۱ |
VRU Project of Arak, Ahvaz, Mashhad & Tabriz |
National Iranian Oil Products Distribution Company |
EPC |
In Progress |
Designing, Supplying and Installation of 4 Sets Of Collecting and Recycling Of Petrol Vapor In Arak, Ahvaz, Mashhad & Tabriz Cities |
۱۲ |
Rental of 2 Drilling Land Rig & Drilling Services |
National Iranian South Oil Company |
Daily
Rate |
In Progress |
Drilling Operation at Kupal, Azadegan, Ahvaz and Maru |
۱۳ |
Development of Mobin Petrochemical Complex – Utility |
Mobin Petrochemical Complex |
EPC |
Completed |
Construction of 2 X 123 MW Gas Power Plant and Two 330 Ton HRSGs |
۱۴ |
Construction of 2 X 123 MW Gas Power Plant and Two 330 Ton HRSGs |
Mobin Petrochemical Complex |
EPC |
Completed |
Construction of 6 X 123 MW Gas Power Plants and Six 330 Ton HRSGs |
۱۵ |
Fajr II Petrochemical Complex- Utility |
Fajr Petrochemical Complex |
EPC |
Completed |
Construction Of A 4 X 157 MW Gas Power Plants and Two 330-Tph Boilers |
۱۶ |
Pars Power plant and Steam |
Damavand Petrochemical Complex |
EPC |
Completed |
Construction of Two 162-MW Gas Units, Two 330-Tph HRSGs and One 160-Tph Auxiliary Boiler |
۱۷ |
3D Seismic Operations of Common Fields |
Iranian Offshore Oil Company (IOOC) |
3D Seismic Data Acquisition |
Completed |
3D Seismic Data Acquisition for North-West Reshadat and Sepand Gas fields |
۱۸ |
3D Seismic Operations of Forooz B, Siri L and Chavosh fields |
Iranian Offshore Oil Company (IOOC) |
3D Seismic Data Acquisition |
Completed |
3D Seismic Data Acquisition for Forooz B, Siri L and Chavosh Fields |
19 |
3D Seismic Operations of Toosan and Alpha Fields |
Petro Pardazaan Pooya Co. |
3D Seismic Data Acquisition |
Completed |
3D Seismic Data Acquisition for North-West Toosan, Alpha And Tousan Fields |
20 |
Drilling of Sepehr Exploration well |
Exploration Directorate |
Daily Rate |
Completed |
Drilling Operation of Sepehr Exploration WELL |